All Issue

2020 Vol.22, Issue 1 Preview Page

Research Paper

31 January 2020. pp. 47-58
Abstract
References
1
Choi, W.Y., Lee, H.P., Jun, G.C., Lee, S.W. (2014), “Evaluation of waterproof and durability of hydrophilic waterstop”, Journal of Korean Tunnelling and Underground Space Association, Vol. 16, No. 2, pp. 117-124.
10.9711/KTAJ.2014.16.2.117
2
Heo, S.M., Jung, H., Lee, S.W. (2018), “Waterproofing performance evaluation according to each waterproofing material due to segment construction error”, Journal of Korean Tunnelling and Underground Space Association, Vol. 20, No. 6, pp. 1023-1037.
3
Hyun, K.C., Min, S.Y., Moon, J.B., Jeong, G.H., Lee, I.M. (2012), “Risk management applicable to shield TBM tunnel: I. Risk factor analysis”, Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 6, pp. 667-681.
10.9711/KTAJ.2012.14.6.667
4
Kim, S.H., Kim, W.K., Lee, H.Y. (2013), “Effect of segment thickness during shield TBM tunnelling in case study”, Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 3, pp. 311-320.
10.9711/KTAJ.2013.15.3.311
5
Kim, Y.I., Hencher, S.R., Yoon, Y.H., Cho, S.K. (2002), “Determination of the construction method for Young Dong tunnel by risk assessment”, Journal of Korean Tunnelling and Underground Space Association, Vol. 4, No. 1, pp. 13-25.
6
Lee, S.W., Jeoung, J.H., Hwang, J.H. (2009), “Evaluation of hydrophilic waterstop for shield TBM tunnel under high water pressure”, Proceedings of the Korean Geo-Environmental Conference, Seoul, pp. 389-392.
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 22
  • No :1
  • Pages :47-58
  • Received Date : 2019-11-05
  • Revised Date : 2019-12-11
  • Accepted Date : 2019-12-13