All Issue

2020 Vol.22, Issue 1 Preview Page

Research Paper

31 January 2020. pp. 135-144
Abstract
References
1
Glover, P.W.J., Hole, M.J., Pous, J. (2000), “A modified Archie’s law for two conducting phases”, Earth and Planetary Science Letters, Vol. 180, No. 3-4, pp. 369-383.
10.1016/S0012-821X(00)00168-0
2
Hong, C.H., Chong, S.H., Cho, G.C. (2019a), “Theoretical study on geometries of electrodes in laboratory electrical resistivity measurement”, Applied Sciences, Vol. 9, No. 19, 4167.
10.3390/app9194167
3
Hong, C.H., Chong, S.H., Hong, E.S., Cho, G.C., Kwon, T.H. (2019b), “Theoretical and experimental studies on influence of electrode variations in electrical resistivity survey for tunnel ahead prediction”, Journal of Korean Tunnelling and Underground Space Association, Vol. 21, No. 2, pp. 267-278.
4
Jung, H.S., Choi, J.M., Chun, B.S., Park, J.S., Lee, Y.J. (2011), “Causes of reduction in shield TBM performance - A case study in Seoul”, Tunnelling and Underground Space Technology, Vol. 26, No. 3, pp. 453-461.
10.1016/j.tust.2011.01.001
5
Kim, K.S., Kim, J.H., Jeong, L.C., Lee, I.M., Cho, G.C. (2015), “Development for prediction system of TBM tunnel face ahead using probe drilling equipment and drilled hole imaging equipment”, Journal of Korean Tunnelling and Underground Space Association, Vol. 17, No. 3, pp. 393-401.
10.9711/KTAJ.2015.17.3.393
6
Li, S., Liu, B., Xu, X., Nie, L., Liu, Z., Song, J., Sun, H., Chen, L., Fan, K. (2017), “An overview of ahead geological prospecting in tunneling”, Tunnelling and Underground Space Technology, Vol. 63, Supplement C, pp. 69-94.
10.1016/j.tust.2016.12.011
7
Ministry of Land Transportation (2014), Underground land use compensation criteria for railway construction, Notice No. 2014-104.
8
Roy, A., Apparao, A. (1971), “Depth of investigation in direct current methods”, Geophysics, Vol. 36, No. 5, pp. 943-959.
10.1190/1.1440226
9
Ryu J., Park, J., Lee, S.W., Lee, I.M., Kim, B.K. (2018), “Forward probing utilizing electrical resisivity and induced polarization for predicting mixed-ground ahead of TBM tunnel face”, Journal of Korean Tunnelling and Underground Space Association, Vol. 20, No. 1, pp. 55-72.
10
Schaeffer, K., Mooney, M.A. (2016), “Examining the influence of TBM-ground interaction on electrical resistivity imaging ahead of the TBM”, Tunnelling and Underground Space Technology, Vol. 58, pp. 82-98.
10.1016/j.tust.2016.04.003
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 22
  • No :1
  • Pages :135-144
  • Received Date : 2020-01-02
  • Revised Date : 2020-01-09
  • Accepted Date : 2020-01-10