All Issue

2020 Vol.22, Issue 3

Research Paper

31 May 2020. pp. 219-237
Abstract
References
1
Ates, U., Bilgin, N., Copur, H. (2014), "Estimating torque, thrust and other design parameters of different type TBMs with some criticism to TBMs used in Turkish tunneling projects", Tunnelling and Underground Space Technology, Vol. 40, pp. 46-63.
10.1016/j.tust.2013.09.004
2
Bilgin, N., Algan, M. (2012), "The performance of a TBM in a squeezing ground at Uluabat, Turkey", Tunnelling and Underground Space Technology, Vol. 32, pp. 58-65.
10.1016/j.tust.2012.05.004
3
Bruland, A. (2000), Hard rock tunnel boring, Ph.D. Dissertation, Norwegian University of Science and Technology.
4
Chang, S.H., Choi, S.W., Park, Y.T., Lee, G.P., Bae, G.J. (2013), "Experimental evaluation of the effects of cutting ring shape on cutter acting forces in a hard rock", Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 3, pp. 225-235.
10.9711/KTAJ.2013.15.3.225
5
Choi, S.W., Chang, S.H., Lee, G.P., Bae, G.J. (2011), "Statistical analysis of NTNU test results to predict rock TBM performance", Journal of Korean Tunnelling and Underground Space Association, Vol. 13, No. 3, pp. 243-260.
6
JSCE (2007), Standard specifications for tunneling - shield tunnels, pp. 39-55.
7
Kang, S.H., Kim, D.H., Kim, H.T., Song, S.W. (2017), "Study on the structure of the articulation jack and skin plate of the sharp curve section shield TBM in numerical analysis", Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 3, pp. 421-435.
10.9711/KTAJ.2017.19.3.421
8
Labra, C., Rojek, J., Onate, E. (2017), "Discrete/finite element modelling of rock cutting with a TBM disc cutter", Rock Mechanics and Rock Engineering, Vol. 50, No. 3, pp. 621-638.
10.1007/s00603-016-1133-7
9
Rostami, J. (1997), "Development of a force estimation model for rock fragmentation with disc cutters through theoretical modelling and physical measurement of crushed zone pressure", Ph.D. Dissertation, Colorado School of Mines, Golden.
10
Rostami, J., Ozdemir, L. (1993), "A new model for performance prediction of hard rock TBMs", Proceedings of the 11th Rapid Excavation and Tunneling Conference, Boston, pp. 793-809.
11
Shi, H., Yang, H., Gong, G., Wang, L. (2011), "Determination of the cutterhead torque for EPB shield tunneling machine", Automation in Construction, Vol. 20, No. 8, pp. 1087-1095.
10.1016/j.autcon.2011.04.010
12
Wang, L., Gong, G., Shi, H., Yang, H. (2012), "Modeling and analysis of thrust force for EPB shield tunneling machine", Automation in Construction, Vol. 27, pp. 138-146.
10.1016/j.autcon.2012.02.004
13
Zhou, X.P., Zhai, S.F. (2018), "Estimation of the cutterhead torque for earth pressure balance TBM under mixed-face conditions", Tunnelling and Underground Space Technology, Vol. 74, pp. 217-229.
10.1016/j.tust.2018.01.025
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 22
  • No :3
  • Pages :219-237
  • Received Date : 2020-04-10
  • Revised Date : 2020-04-21
  • Accepted Date : 2020-04-29