All Issue

2014 Vol.16, Issue 6 Preview Page
30 November 2014. pp. 543-552
Abstract
References
1
1.An, M.S., Lim, K.S., Kim, K.J. (2011), “A study on advance rate under the operating conditions of EPB shield TBM based on TBM operation data”, Korean Society of Civil Engineers (KSCE), Vol. 31, No. 6, pp. 839-848.
2
2.No, H.J. (2008), “Management science by microsoft excel 2007”, Hanol publishing company, pp. 45-69.
3
3.Sousa, R.L., Einstein, H.H. (2012), “Risk analysis during tunnel construction using bayesian netwarks: porto metro case study”, Tunnelling and Underground Space Technology (TUST) ,Vol. 27, pp. 86-100.
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 16
  • No :6
  • Pages :543-552
  • Received Date : 2014-10-21
  • Revised Date : 2014-10-31
  • Accepted Date : 2014-11-03