All Issue

2012 Vol.14, Issue 6 Preview Page
30 November 2012. pp. 667-681
Abstract
References
1

1.Bae, G.J., Chang, S.H. (2006), “Improvement and evaluation of TBM performance by considering construction risk”, KTA 2006 Symposium, pp. 11-46.

2

2.Huh, S.K., Lee, J.H., Jeong, J.T. (2005), “Analysis of train accident in korea using FTA and AHP”, Journal of The Korean Institute of Plant Engineering, Vol. 10, No. 2, pp. 123-135.

3

3.ITA (2004), “ITA/AITES Accredited material guidelines for tunnelling risk management: international tunnelling association”, Tunnelling and Underground Space Technology, Vol. 19, No. 2, pp. 217-237.

4

4.KTA (2008), Series of Tunnel Engineering 3 - Tunnel Mechanized Construction Design, CIR, Seoul. pp. 3-6.

5

 5.Ku, B.H., Cha, J.M., Kim, H.C. (2008), “Reliability analysis of distribution systems by using FTA”, The Korean Institute of Electrical Engineers power engineering autumnal conference, pp. 247-249.

6

6.PMI (2000), Project Risk Management, PMBOK 2000 Edition. pp. 127-130.

7

7.Song, H., Park, H.G., Go, S.S. (2006), “A study on the analysis of accident cause of form work using FTA(Fault Tree Analysis) system”, Journal of Construction Association of Korea, Vol. 22, No. 6, pp. 119-127.

Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 14
  • No :6
  • Pages :667-681