Abstract
References
Cho, G., Cho, Y., Gang, H. (2003), “The analytic hierarchy process”, Donghyun Publisher, Gyeonggi, Korea. Chong, W. (2013), “Tunnel Boring Machine (TBM) performance in Singapore’s Mass Rapid Transit (MRT) system”, Master Thesis, Massachusetts Institute of Technology, Cambridge, Massachusetts. Hyun, K.C., Min, S., Choi, H., Park, J., Lee, I.M. (2015), “Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels”, Tunnelling and Underground Space Technology, Vol. 49, pp. 121-129. Koh, S.Y., Kwon, S.J., Choo, S.Y., Kim, Y.M. (2010), “The study of the disputed issues during the soft ground shield TBM design and construction according to shield TBM trouble case study”, 2010 Fall Conference of the Korean Society for Railway, Jeju, Korea, pp. 2362-2371. Kwak, J.H., Park, H.K. (2009), “A case study of delay analysis for E.P.B shield TBM method in construction site”, Journal of the Korean Society of Civil Engineers, Vol. 29, No. 6D, pp. 737-743. Maidl, B., Herrenknecht, M., Anheuser, L. (1996), “Mechanised shield tunneling”, Ernst & Sohn, Berlin, Germany. Park, J. (2015), “A risk management system applicable to shield TBM tunnel using Bayesian network”, Ph.D. Dissertation, Korea University, Seoul, Korea. Tóth, Á., Gong, Q., Zhao, J. (2013), “Case studies of TBM tunneling performance in rock-soil interface mixed ground”, Tunnelling and Underground Space Technology, Vol. 38, pp. 140-150.
Information
- Publisher :Korean Tunneling and Underground Space Association
- Publisher(Ko) :한국터널지하공간학회
- Journal Title :Journal of Korean Tunnelling and Underground Space Association
- Journal Title(Ko) :한국터널지하공간학회 논문집
- Volume : 18
- No :5
- Pages :453-467
- Received Date : 2016-08-30
- Revised Date : 2016-09-19
- Accepted Date : 2016-09-21
- DOI :https://doi.org/10.9711/KTAJ.2016.18.5.453


Journal of Korean Tunnelling and Underground Space Association







