All Issue

2014 Vol.16, Issue 4 Preview Page
31 July 2014. pp. 361-372
Abstract
References
1
1.Dalgις, S. (2003), “Tunneling in fault zones, tuzla tunnel, turkey”, Tunnelling and Underground Space Technology, Vol. 18, No. 5, pp. 453-465.
2
2.Kim, C.Y., Hong, S.W., Kim, K.Y., Baek, S.H. (2004), “A study on interpretations of tunnel convergence function parameters”, Tunnelling Technology, Korean Tunnelling Association, Vol. 6, No. 3, pp. 183-197.
3
3.Kim, K.Y., Yim, S.B., Kim, J.K., Seo, Y.S., Kim, J.W. (2010), “Predicition of a fault zone ahead of a tunnel face based on the orientation of displacement vectors”, The Journal of Engineering Geology, Vol. 20, No. 4, pp. 371-380.
4
4.Lee, C.K. (2014), “Correlation analysis of rock properties and hazard distribution using 3D FEM FEM strike-slip fault model”, Master’s thesis of Chungbuk National University, pp. 17-19.
5
5.Lee, C.S., Lee, H.M. (2009), “Hydrothermal alteration and engineering characteristics in the bokan tunnel area passing through the YangSan fault”, Jour. Geol. Soc. Korea, Vol. 22, No. 1, pp. 13-22.
6
6.Lee, I.M., Kang, G.D., Park, K.J. (1998), “Prediction of ground-condition ahead of the tunnel face by using 3-dimensional absolute displacements”, The Journal of the Korean Geotechnical Society, Vol. 14, No. 4, pp. 17-31.
7
7.Panet, M., Guenot, A. (1982), “Analysis of convergence behind the face of a tunnel, Tunnelling 1982”, The Institution of Mining and Metallurgy, pp. 197-204.
8
8.Park, Y.J., You, K.H., Song, H.S., Kim, K.S., Lee, D.H. (2004), “The prediction of ground condition ahead of the tunnel face using 3-dimensional numerical analysis”, Tunnel & Underground Space, Journal of Korean Society for Rock Mechanics, Vol. 14, No. 6, pp. 440-449.
9
9.Schubert, W., Steindorfer, A. (1996), “Selective displacement monitoring during tunnel excavation”, Felsbau, Vol. 14, No. 2, pp. 93-98.
10
10.Schubert, W., Vavrovsky, G.M. (1994), “Interpretation of monitoring results”, World Tunnelling and subsurface excavation, Vol. 7, No. 8, pp. 351-356.
11
11. Shewhart, W.A. (1924), “Some applications of statistical methods to the analysis of physical and engineering data”, Bell System Technical jounal, Vol. 3, No. 1, pp. 43-87
12
12. Steindorfer, A. (1998), “Short term prediction of rock mass behaviour in tunnelling by advanced analysis of displacement monitoring data”, Doctoral Thesis at Institute for Rock Mechanics and Tunnelling, Techn. Univ. Graz, Austria.
13
13. Sulem, J., Panet, M., Guenet, A. (1987), “An analytical solution for time-dependent displacement in a circular tunnel”, Int. J. Rock Mech. Min. Sci. & Geomech. Abstr, Vol. 24, No. 3, pp. 155-164.
14
14. Yim, S.B., Jeong, H.G., Seo, Y.S. (2009), “Assessment of tunnel displacement with weak zone orientation using 3-D numerical analysis”, The Journal of Engineering Geology, Vol. 19, No. 1, pp. 43-50.
15
15. Yim, S.B., Seo, Y.S. (2009), “A new method for the analysis of measured displacements during tunnelling using control charts”, The Journal of Engineering Geology, Vol. 19, No. 3, pp. 261-268.
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 16
  • No :4
  • Pages :361-372
  • Received Date : 2014-06-30
  • Revised Date : 2014-07-11
  • Accepted Date : 2014-07-16