Abstract
References
1.ITA WG Mechanized Tunneling (2000), “Recommendations and Guidelines for Tunnel Boring Machines (TBMs)”, pp. I-22-I-34. 2.ITA-AITES WG “Research” (2007), “ITA/AITES report 2006 on settlements induced by tunneling in soft ground”, Tunnelling and Underground Space Technology, Vol. 22, pp. 119-149. 3.Kang, T.H. (2013), “A study of earth pressure calculating method about shield TBM tunnel segments in the rock”, Master Thesis, Hanyang University. 4.Kim, J.Y. (2013), “EPB shield TBM tunnel construction –How to set the face pressure value and management for the stability of face-”, Korean Geotechnical Society, Vol. 29, No. 2, pp. 21-27. 5.Koh, S.Y., Kwon, S.J., Hwang, C.H., Kim, S.I., Choo, S.Y. (2011), “A study on gap parameter and influence area of ground settlement using back analysis constructed by shield TBM with shallow depth”, 2013 Autumn Conference & Annual Meeting of the Korean Society for Railway, Vol. 14, No. 2, pp. 1509-1518. 6.Lee, K.M., Rowe, R.K., Lo, K.Y. (1992), “Subsidence owing to tunnelling, I. estimating the gap parameter”, Canada, Geotech. J., Vol. 29, pp. 929-941. 7.Peck, R.B. (1969), “Deep excavations and tunneling in soft ground”, Proceedings of the 7th international conference on Soil Mechanics and Foundation Engineering, Mexico City, State of the Art Volume, pp. 225-290. 8.Schmidt, B. (1969), “Settlements and ground movements associated with tunneling in soils”, PhD Thesis, University of Illinois.
Information
- Publisher :Korean Tunneling and Underground Space Association
- Publisher(Ko) :한국터널지하공간학회
- Journal Title :Journal of Korean Tunnelling and Underground Space Association
- Journal Title(Ko) :한국터널지하공간학회 논문집
- Volume : 16
- No :2
- Pages :213-224
- Received Date : 2014-03-10
- Revised Date : 2014-03-19
- Accepted Date : 2014-03-21
- DOI :https://doi.org/10.9711/KTAJ.2014.16.2.213


Journal of Korean Tunnelling and Underground Space Association







