Research Paper
Abstract
References
Information
Koh, S.Y., Kwon, S.J., Hwang, C.H., Kim, S.I., Choo, S.Y. (2011), “A study on gap parameter and influence area of ground settlement using back analysis constructed by shield TBM with shallow depth”, Proceedings of the 2011 Spring Conference of the Korean Society for Railway, Hoengseong, pp. 1509-1518.
Oh, J.Y., Park, H.K., Kim, D.H., Chang, S.B., Lee, S.B., Choi, H.S. (2017), “Study on the effect of tail void grouting on the short- and long-term surface settlement in the shield TBM Tunneling using numerical analysis”, Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 2, pp. 265-281.
10.9711/KTAJ.2017.19.2.265
Sugiyama, T., Hagiwara, T., Nomoto, T., Nomoto, M., Ano, Y., Mair, R.J., Bolton, M.D., Soga, K. (1999), “Observations of ground movements during tunnel construction by slurry shield method at the Docklands Light Railway Lewisham extension-East London”, Soils and Foundations, Vol. 39, No. 3, pp. 99-112.
10.3208/sandf.39.3_99
- Publisher :Korean Tunneling and Underground Space Association
- Publisher(Ko) :한국터널지하공간학회
- Journal Title :Journal of Korean Tunnelling and Underground Space Association
- Journal Title(Ko) :한국터널지하공간학회 논문집
- Volume : 24
- No :1
- Pages :79-94
- Received Date : 2021-11-15
- Revised Date : 2022-01-05
- Accepted Date : 2022-01-05
- DOI :https://doi.org/10.9711/KTAJ.2022.24.1.079


Journal of Korean Tunnelling and Underground Space Association







