All Issue

2018 Vol.20, Issue 2 Preview Page
31 March 2018. pp. 269-286
Abstract
References
1
Anagnostou, G., Kovari, K. (1996), “Face stability conditions with earth-pressure -balanced shields”, Tunnelling and Underground Space Technology, Vol. 11, No. 2, pp. 165-173.
2
Biosca, F., Bono, R. (2008), “Construccion de la linea 9 del metro de Barcelona”, Obras Urbanas Magazine, pp. 1-8.
3
DIN 4085 (2011), “Baugrund-Berechnung des Erddrucks”, pp. 1-22.
4
Gatti, M.C., Cassani, G. (2007), “Ground loss control in EPB TBM Tunnel excavations”, Underground space-the 4th dimension of metropolis, Proceedings of the world tunnel congress, Prague, pp. 1141-1146.
5
Kim, K.H., Kim, H., Mun, C.H., Kim, Y.H., Kim, D.H., Lee, J.Y. (2017), “A study on the establishment of domestic criteria through analysis of shield TBM requirements in overseas ITB (Invitation to Bid)”, Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 6, pp. 985-997.
6
Lee, G.J., Kwon, T.H., Kim, K.Y., Song, K.I. (2017), “Relationship between brittleness index of hard rocks and TBM penetration rates”, Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 4, pp. 611-634.
7
Lovera, V. (2010), “Tunnelling with full face shield machines: study of the backfill of the tail void”, Ph.D. Thesis, Central University of Venezuela, pp. 31-49.
8
Mollon, G., Dias, D., Soubra, A.H. (2013), “Probabilistic analyses of tunneling-induced ground movements”, Acta Geotechica, Vol. 8, No. 2, pp. 181-199.
9
Murayama, S. (1966), “Review of excavation performance of mechanized shield from viewpoint of soil mechanics”, Proceedings of the 1st Japan National Conference on Soil Mechanics and Foundation Engineering, pp. 12-17.
10
Peila (2010), “Personal communication”.
11
Ramirez (2010), “Personal communication”.
12
Seong, J.H., Youn, J.U. (2017), “Identification and importance analysis of hazards affecting the stability of TBM tunnelling works”, Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 6, pp. 973-983.
13
Wittke, W. (2007), “Stability analysis and design for mechanized tunnelling”, WBI-PRINT6, pp. 16-22.
14
Yu, J.S. (2016), “Evaluation of the face pressure for slurry shield TBM”, Master Thesis, Konkuk University, pp. 34-55.
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 20
  • No :2
  • Pages :269-286
  • Received Date : 2018-01-05
  • Revised Date : 2018-02-02
  • Accepted Date : 2018-02-07