1. Han, K.M., Park, I.J. (2002). “An environmentally tuinnel construction method at low overburden”, J of Korean tunneling and Underground space Association, Vol. 4, No. 3, pp. 207-216.
2.An, J.H., Lee, S.D. (2009). “Behavior of braced rib arch in shallow tunnel excavated by semi cut-and-cover method”, J of Korean tunneling and Underground space Association, Vol. 11, No. 4, pp. 419-425.
3.Sauer, G. (1992). “The schurzegerg tunnel. oberrieden, sept., proc, 1st international symposium on tunnel construction and underground structures”, Ljubljana, Slovenia, Chap. 2, pp. 151-165.
4.Lee, S.J., Na, S.M., kim, S.H., Lee, S.D. (2005), “Development and verification of the new method for shallow overburden tunnel”, Proc of KSCE, pp. 3684-3687.
5.Jung, M.K., Park, C.M., Lee, H., Kim, S.R. (2001). “A case study on the shallow overburden tunnelling with a frame slab method”, KGS Spring National Conference.
6.Bae, G.J., Chung, H.S., Lee, G.P. (2003). “A study on eccentric load acted on cut and cover tunnel by numerical approach”, J of Korean tunneling and Underground space Association, Vol. 5, No. 3, pp. 227-239.
7.Yang, J.W., Lee, S.D. (2010). “Behavior of arch slab in the shallow tunnel constructed perpendicular to the slope by Semi cut-and-cover method”, J of Korean tunneling and Underground space Association, Vol. 12, No. 2, pp. 157-164.
- Publisher :Korean Tunneling and Underground Space Association
- Publisher(Ko) :한국터널지하공간학회
- Journal Title :Journal of Korean Tunnelling and Underground Space Association
- Journal Title(Ko) :한국터널지하공간학회 논문집
- Volume : 15
- No :2
- Pages :113-122
- DOI :https://doi.org/10.9711/KTAJ.2013.15.2.113


Journal of Korean Tunnelling and Underground Space Association







