All Issue

2016 Vol.18, Issue 2 Preview Page
31 March 2016. pp. 165-173
Abstract
References
1
1.Kim, D.K., Bae, G.J. (2008), “Develope of a labora-tory testing method for evaluating the loading capability of lattice girser”, Korean Tunnelling and Underground Space Technology, Vol. 10, No. 4, pp. 1-12.
2
2.Kim, D.K., Bae, G.J. (2011), “BK-Lattice girder”, Korean Tunnelling and Underground Space Tech-nology, pp. 435-440.
3
3.Kim, D.K., Lee, S.H., Choi, Y.N. (2008), “Evaluation of loading capacity of lattice girder according to laboratory testing method”, 2008 Proceedings of Korean Geo-Environmental Society, Korean Geo- Environmental Society, pp. 399-460.
4
4.Kim, D.K., Lee, S.H., Kim, N.Y. (2009), “Status and capacity of lattice girder”, 2009 Proceedings of Korean Geo-Environmental Society, pp. 371-380.
5
5.Ministry of Land, Infrastructure and Transport (2015), “Guidelines for the design of tunnel”, pp. 48-50.
6
6.Ministry of Land, Infrastructure and Transport (2015), “Tunnel construction guide specification”, pp. 35-39.
7
7.Moon, H.D. (1999), “Evaluation on the applicability of a lattice girder for a support system in tunnelling”, Korean Society for Rock Mechanics, pp. 204-213.
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 18
  • No :2
  • Pages :165-173
  • Received Date : 2016-02-12
  • Revised Date : 2016-02-26
  • Accepted Date : 2016-03-02