All Issue

2014 Vol.16, Issue 2 Preview Page
31 March 2014. pp. 125-133
Abstract
References
1
1.AITES-ITA Working Group No. 14 (2000), Recommendations and Guidelines for Tunnel Boring Machines (TBMs), International Tunnelling and Underground Space Association, pp. 1-118.
2
2.Bieniawski, Z.T., Celada, B., Galera, J.M., Tardaguila, I. (2008), “New applications of the excavability index for selection of TBM types and predicting their performance”, World Tunnel Congress 2008 - Underground Facilities for Better Environment and Safety, pp. 1618-1629.
3
3.Bryson, N. (1999), “Generating consensus priority point vectors: A logarithmic goal programming”, Computers & Operations Research, Vol. 26, pp. 637-643.
4
4.Edalat, K., Vahdatirad M.J., Ghodrat, H., Firouzian, S., Barari, A. (2010), “Choosing TBM for tabriz subway using multi criteria method”, Journal of civil engineering and management, Vol. 16, No. 4, pp. 531-539.
5
5.German Tunnelling Committee Working Group (2000), Recommendations for selecting and evaluating tunnel boring machines, tunnel 5/97 ,Deutscher Ausschuß fur unterirdisches Bauen, pp 20-35.
6
6.Hamidi, J.K., Shahriar, K., Rezai, B., Rostami, J., Bejari, H. (2010), “Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP”, Bulletin of Engineering Geology and the Environment, Vol. 69, No. 4, pp. 523-532.
7
7.Kim, M.G., Lee, Y.S. (2008), “A suggestion of a new rock mass classification system”, Journal of the Korean Geotechnical society, Vol. 24, No. 11, pp. 43-53.
8
8.Korea Express Corporation (1996), road design guideline, Vol. 2, part 5, pp. 41-42.
9
9.Maidl, B, Herrenknecht, M, Maidl, U., Wehrmeyer, G. (2012), Mechanised Shield Tunnelling 2nd Edition, Ernst & Sohn, Germany, pp. 262-264, pp. 400-447.
10
10.Mikhailov, L. (2004), “Group prioritization in the AHP by fuzzy preference programming method”, Computers & Operations Research, Vol. 31, pp. 293-301.
11
11.Ramanathan, R., Ganesh, L.S. (1994), “Group preference aggregation methods employed in AHP: An evaluation and an intrinsic process for deriving members weightages”, European Journal of Operational Research, Vol. 79, pp. 249-265.
12
12.Saaty, T.L. (1977), “A scaling method for priorities in hierarchy structures”, Journal of Mathematical Psychology, Vol. 15, No. 3, pp. 234-281.
13
13.Saaty, T.L. (1980), The Analytic Hierarchy Process, McGraw-Hill, New York.
14
14.Shahriar, K., Sharifzadeh, M., Hamidi, J.K., (2008), “Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions”, Tunnelling and Underground Space Technology, Vol. 23, pp. 318-325.
15
15.Taheri, A., Borujeni, H.A.M. (2008), “Tunnelling machine selection for tunnel excavation in rock, using AHP method: CASE STUDY: Line 1 of the esfahan metro project”, International Conference and Exhibition on Tunnelling, International Tunnelling and Underground Space Association.
16
16.Yazdani-Chamzini, A., Yakhchali, S.H. (2012), “TBM selection using fuzzy multicriteria decision making methods”, Tunnelling and Underground Space Technology, Vol. 30, pp. 194-204.
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 16
  • No :2
  • Pages :125-133
  • Revised Date : 2014-02-18
  • Accepted Date : 2014-02-28