All Issue

2007 Vol.9, Issue 4
31 December 2007. pp. 323-330
Abstract
References
1
1.김상균, 김태혁, 이인모 (2003), “2-Arch 도로터널 설계 및 시공 개선방안 고찰”, 한국터널공학회지, pp. 29-38.
2
2.김도식, 김영근, 이두화, 김창용, 배규진, 이승호, 이호성 (2004), “비대칭 근접병설터널의 안정성 및 보강공법 검토”, 제4회 터널시공기술향상 대토론회, 대한토목학회, pp. 181-197.
3
3.한국터널공학회 (2002), “터널의 이론과 실무”, 터널공학시리즈 No. 1, pp. 225-226.
4
4.한국도로공사 (2001), “터널 설계실무 자료집” pp. 619-627
5
5.Kamimura M. (1997), “Discussion on the behaviors of parallel tunnel with a small clearance”, Proceedings of the 28th ITA General Assembly and World Tunnel Congress, pp. 898-906.
6
6.Kobayashi M. (1994), “Observational construction of a large section minimun interval twin road tunnel in urban alluvial loose sand soil”, Tunnel and Ground Conditions, Abdel Salam(ed), Balkema, Rotterdam, pp. 157-164.
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 9
  • No :4
  • Pages :323-330