All Issue

2015 Vol.17, Issue 3 Preview Page
31 May 2015. pp. 305-317
Abstract
References
1
1.Cho, J.S. (2008), “Analysis of ground movements and lining segment in shield TBM based on three dimensional finite element method”, Pukyong National University, pp. 15-25.
2
2.LIM KEN CHAI (2003), “Three-dimension-al finite element analysisof earth pressure balance tunnelling”, national university of singapore, pp. 121-198.
3
3.SVEN CHRISTIAN MÖ LLER. (2006), “Tunnel induced settlements and structural forces in linings”, Eigenverlag des Instituts für Geotechnik, pp. 108-111.
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 17
  • No :3
  • Pages :305-317
  • Received Date : 2015-04-15
  • Revised Date : 2015-05-01
  • Accepted Date : 2015-05-06