Abstract
References
2.Hyun, K.C., Min, S.Y., Moon, J.B., Jeong, G.H., Lee, I.M. (2012a), “Risk management applicable to shield TBM tunnel: Ⅰ. Risk factor analysis”, Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 6, pp. 667-681. 3.Hyun, K.C., Min, S.Y., Moon, J.B., Jeong, G.H., Lee, I.M. (2012b), “Risk management applicable to shield TBM tunnel: Ⅱ. Risk analysis method-ology”, Journal of Korean Tunnelling and Under-ground Space Association, Vol. 14, No. 6, pp. 683-697. 4.Lee, K.H., Seo, H.J., Park, J.H., Ahn, H.Y., Kim, K.S., Lee, I.M. (2012), “A study on correlation between electrical resistivity obtained from electrical resistivity logging and rock rating in-situ tunnelling site”, Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 5, pp. 503-516. 5.Lee, K.H. (2014), “Predictions of ground conditions ahead of tunnel face applicable to TBM”, Ph.D. Dissertation, Korea University. 6.Lee, K.I. (2003), “Selecting on the preferred alternatives of the MADM problems using the entropy measure”, Journal of the Society of Korea Industrial and Systems Engineering, Vol. 26, No. 2, pp. 55-61.
Information
- Publisher :Korean Tunneling and Underground Space Association
- Publisher(Ko) :한국터널지하공간학회
- Journal Title :Journal of Korean Tunnelling and Underground Space Association
- Journal Title(Ko) :한국터널지하공간학회 논문집
- Volume : 18
- No :1
- Pages :1-12
- Received Date : 2015-10-12
- Revised Date : 2015-11-27
- Accepted Date : 2016-01-18
- DOI :https://doi.org/10.9711/KTAJ.2016.18.1.001


Journal of Korean Tunnelling and Underground Space Association







