Abstract
References
1.Alpay, S., Yavuz, M. (2009), “Underground mining method selection by decision making tools.”, Tunnel. Underg, Vol. 24, Issue 2, pp. 173-184. 2.Bieniawski, Z.T., Tamames, B.C., Fernandez, J.M.G., Hernandez, M.A. (2006), “Rock mass excavability indicator: new way to selecting the optimum tunnel construction method.” In:ITA-AITES World Tunnel Congress&32nd ITA General Assembly, Seoul, Korea. 3.Boshkov, S.H., Wright, F.D. (1973), Basic and parametric criteria in the selection, design and development of underground mining systems, SME Mining Engineering Handbook. SME-AIME, New York. 4.Cheng, C-H. (1997), “Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of member ship function.”, European Journal of Operational Research, Vol. 96, Issue 2, pp. 343-350. 5.Cheng, C-H., Yang, K-L., Hwang, C-L. (1999), “Evaluating attack helicopter s by AHP based on linguistic variable weight.”, European Journal of Operational Research, Vol. 116, Issue 2, pp. 423- 435. 6.Dyer, J.S., Wendell, R.E. (1985), “A critique of the analytic hierarchy process.”, Working paper 84/85-4-24, Department of Management, The University of Texas at Austin. 7.Einstein, H.H., Dudt, J.P., Halabe, V.B., Descoudres, F. (1992), “Decision aids in tunneling-principle and practical application.”, Monograph. Swiss Federation Office of Transportation. 9.ITA (2000), Recommendations and Guidelines for Tunnel Boring Machines (TBMs). ITA-AITES Working Group No. 14. 11.Korea Rail Network Authority (2012), Guide Spec-ification for High Speed Railway Construction (Subbase volume). 12.Kourosh Shahriar, Mostafa Sharifzadeh, Jafar Khademi Hamidi (2008), “Geotechnical risk assess-ment based approach for rock TBM selection in difficult ground conditions.”, Tunnelling and Under-ground Space Technology, 23, 318-25. 13.Laubscher, D.H. (1981), Selection of Mass Unde-rground Mining Methods, Design and Operation of Caving and Sublevel Stoping Mines. SME-AIME, New York. 14.Levary, R.R., Wan, K. (1997), “An analytic hierarchy process based simulation model for entry mode decision regarding foreign direct investment.”, Omega, Vol. 27, Issue 6, pp. 661-677. 15.Miller-Tait, L., Panalkis, R., Poulin, R. (1995), “UBC mining method selection.”, In: Proceeding of the Mine Planning and Equipment Selection Symposium, pp. 163-168. 18.Ministry of Land, Infrastructure and Transport (2013), Railway Design Criteria (Subbase volume), Korea Rail Network Authority. 20.Nicholas, D.E. (1981), Method Selection - A Numerical Approach, Design and Operation of Caving and Sublevel Stoping Mines. SME-AIME, New York. 21.Nord, G., Stille, H. (1988), “Bore and blast tech-niques in difficult types of rock: Sweden’s experience.”, Int. J. Tunnel. Underground Space Technol. Vol. 3, No. 1, pp. 45-50. 23.Saaty, T.L. (2000), Fundamentals of Decision Making and Priority Theory with the Analytic Hierarchy Process. RWS, Pittsburg. 24.Shim, J.P. (1989), “Bibiographical research on the analytic hierarchy process.”, Socio-Economic Planning Science, Vol. 23, No. 4, pp. 1-25. 25.Singpurwalla, N., Forman, E., Zalkind, D. (1999), “Promoting shared health care decision making using the analytic hierarchy process.”, Socio- Economic Planning Science, Vol. 33, Issue 4, pp. 277-299. 26.Vargas, L.G. (1990), “An overview of the analytic hierarchy process and its applications.”, European Journal of Operational Research, Vol. 48.
Information
- Publisher :Korean Tunneling and Underground Space Association
- Publisher(Ko) :한국터널지하공간학회
- Journal Title :Journal of Korean Tunnelling and Underground Space Association
- Journal Title(Ko) :한국터널지하공간학회 논문집
- Volume : 17
- No :6
- Pages :685-693
- Received Date : 2015-11-09
- Revised Date : 2015-11-19
- Accepted Date : 2015-11-23
- DOI :https://doi.org/10.9711/KTAJ.2015.17.6.685


Journal of Korean Tunnelling and Underground Space Association







