All Issue

2015 Vol.17, Issue 5 Preview Page
30 September 2015. pp. 553-561
Abstract
References
1
1.Georg, J.H., Davorin, K. (2004), Selection of segmental lining system and repairclassification. In: Proceedings of the CSSE Symposium DAMOCS. Dubrovnik, pp. 179-186.
2
2.Federal Highway Administration (2009), Technical Manual for Design and Construction of Road Tunnels-Civil Elements, pp. 4-1-4.6
3
3.JSCE (2005), Interim report on construction loads on segment, JSCE, Japan. (in Japanese)
4
4.Jung, B.D, Park, Y.J. (2002), “A study of deter-mining priorities of ITS services using analytic hierarchy process”, Journal of Korea Planning Association, Korea Planning Association, Vol. 37, No. 6, pp. 138-139.
5
5.Korea Infrastructure Safety Corporation (2004), Tunnel Management & Maintenance Manual.
6
6.Korea Infrastructure Safety Corporation (2010), Guidelines for Safety Inspection and indepth- inspection safety. (Tunnel)
7
7.Korea Infrastructure Safety Corporation (2012), Safety Inspection & In-depth Safety Inspection Guidelines. (Tunnel)
8
8.Saaty, T.L. (1980), The Analytic Hierarchy Process, McGraw-Hill, New York.
9
9.Saaty, T.L. (1996), Multicriteria Decision Making: The Analytic Hierarchy Process, RWS Publications.
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 17
  • No :5
  • Pages :553-561
  • Received Date : 2015-09-04
  • Revised Date : 2015-09-16
  • Accepted Date : 2015-09-21