All Issue

2018 Vol.20, Issue 1 Preview Page
31 January 2018. pp. 73-81
Abstract
References
1
Bang, K.S. (2011), Real estate terms dictionary, Buyonsa, Seoul, pp. 315-316.
2
Ji, H.S., Woo, J.T. (2017), Reinforced concrete, Yeamoonsa, Paju, pp. 261-263.
3
Korea Expressway Corporation (1997), Study on construction method of special bridge monitoring system, pp. 55-60.
4
Korea Train Express (1999). Criteria for establishing the safety measuring equipment for the Gyeongbu high speed rail test line, pp. 30-33.
5
Nam, S.S. (2000), “Case studies on the damage ratio of monitoring sensor”,  Proceedings of the Korean Geotechnical Society Spring Conference at Information Technical Committee, Vol. 1, No. 1, pp. 5-10.
6
Seoul Metropolitan Infrastructure Headquarters (2015), Improvement plan of Seoul subway monitoring management, pp. 70-80.
7
Seoul Metropolitan Rapid Transit Corporation (2002), Seoul subway maintenance monitoring, pp. 234-236.
8
Woo, J.T. (2006), Theory and practice of tunnel monitoring, Goomi, pp. 480-482.
9
Woo, J.T. (2010), “A study of the present state analysis and development plans about construction monitoring and monitoring industry”, Journal of the Korean Society of Civil Engineers, Vol. 30, No. 2D, pp. 163-169.
10
Woo, J.T. (2013), “A study on estimation of the total loss and damage ratio of maintenance monitoring sensor of subway tunnel”, Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 1, pp. 25-31.
11
Woo, J.T. (2017), “Theoretical study on the durability standard of construction monitoring sensors”, Proceedings of the Korean Geotechnical Society Fall Conference, Vol. 2, No. 1, pp.168-169.
12
Woo, J.T., Lee, K.I. (2012), “A study on establishment of measurement and analysis frequency of maintenance monitoring in tunnel”, Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 2, pp. 117-129.
13
Woo, J.T., Lee, R.C. (2014), Theory and practice of construction monitoring-ground construction facilities, CIR, Seoul, pp. 34-36.
14
Woo, J.T., Lee, R.C. (2017), Theory and practice of construction monitoring-underground construction facilities, CIR, Seoul, pp. 92-94.
15
Woo, J.T., Park, J.H., Ji, H.S. (2012), The latest construction estimation, Kimoondang, Seoul, pp. 72-73.
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 20
  • No :1
  • Pages :73-81
  • Received Date : 2017-11-28
  • Revised Date : 2017-12-21
  • Accepted Date : 2018-01-02