Abstract
References
Chai, L.K. (2003), Three-dimensional finite element analysis of earth pressure balance tunnelling, Ph.D. Thesis, National University of Singapore, pp. 135-162. Jun, G.C., Kim, D.H. (2015), “A study on key factors of ground surface settlement due to shield TBM excavation using 3-dimension numerical analysis”, Journal of Korean Tunnelling and Underground Space Association, Vol. 17, No. 3, pp. 305-317. Jun, G.C., Kim, D.H. (2016), “A Intercomparison on the estimating shield TBM tunnel face pressure through analytical and numerical analysis”, Journal of Korean Tunnelling and Underground Space Association, Vol. 18, No. 3, pp. 273-282. Jun, G.C., Kim, D.H. (2017), “A study on key factors of ground settlement due to shield TBM excavation using numerical analysis and field measurement compasion”, Journal of Korean Geosynthetics Society, Vol. 16, No. 1, pp. 63-72.
Information
- Publisher :Korean Tunneling and Underground Space Association
- Publisher(Ko) :한국터널지하공간학회
- Journal Title :Journal of Korean Tunnelling and Underground Space Association
- Journal Title(Ko) :한국터널지하공간학회 논문집
- Volume : 20
- No :2
- Pages :513-525
- Received Date : 2018-02-19
- Revised Date : 2018-03-02
- Accepted Date : 2018-03-06
- DOI :https://doi.org/10.9711/KTAJ.2018.20.2.513


Journal of Korean Tunnelling and Underground Space Association







