All Issue

2023 Vol.25, Issue 3 Preview Page

Technical Paper

31 May 2023. pp. 245-259
Abstract
References
1
Alidoost, F., Austen, G., Hahn, M. (2022), "A multi-camera mobile system for tunnel inspection", Coors et al. (ed.) iCity. Transformative Research for the Livable, Intelligent, and Sustainable City, Springer, pp. 211-224. 10.1007/978-3-030-92096-8_13
2
Amberg (2023), IMS5000 Tunnel Scanning System of AMBERG, https://ambergtechnologies.com (February 7, 2023).
3
Attard, L., Debono, C.J., Valentino, G., Castro, M. (2018), "Tunnel inspection using photogrammetric techniques and image processing: a review", ISPRS Journal of Photogrammetry and Remote Sensing, Vol. 144, pp. 180-188. 10.1016/j.isprsjprs.2018.07.010
4
Bae, S.J., Jung, W., Chamrith, S., Kim, C.J., Kim, Y.M., Hong, S.H., Kim, J.G., Kim, J.Y. (2021), "Performance evaluation method of tunnel scanner for lining crack detection", Journal of the Society of Disaster Information, Vol. 17, No. 1, pp. 39-52. 10.15683/kosdi.2021.3.31.039
5
Balaguer, C., Montero, R., Victores, J.G., Martínez, S., Jardón, A. (2014), "Towards fully automated tunnel inspection: a survey and future trends", Proceedings of the 31st ISARC, Sydney, Australia, pp. 19-33. 10.22260/ISARC2014/0005
6
Chapman, M.A., Min, C., Zhang, D. (2016), "Continuous mapping of tunnel walls in a GNSS-denied environment", Proceedings of the International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives, Prague, Czech Republic, Vol. 41, pp. 481-485. 10.5194/isprsarchives-XLI-B3-481-2016
7
Chen, H.M., Ulianov, C., Shaltout, R. (2015), "3D laser scanning technique for the inspection and monitoring of railway tunnels", Transport Problems, Vol. 10, pp. 73-84. 10.21307/tp-2015-063
8
CNT 887 (2020), Construction New Technology, https://www.kaia.re.kr/portal/newtec/comparelist.do (February 7, 2023).
9
CNT 898 (2020), Construction New Technology, https://www.kaia.re.kr/portal/newtec/comparelist.do (February 7, 2023).
10
CNT 935 (2022), Construction New Technology, https://www.kaia.re.kr/portal/newtec/comparelist.do (February 7, 2023).
11
Cui, H., Ren, X., Mao, Q., Hu, Q., Wnag, W. (2019), "Shield subway tunnel deformation detection based on mobile laser scanning", Automation in Construction, Vol. 106, 102889. 10.1016/j.autcon.2019.102889
12
Du, L., Zhong, R., Sun, H., Zhu, Q., Zhang, Z. (2018), "Study of the integration of the CNU-TS-1 mobile tunnel monitoring system", Sensors, Vol. 18, No. 2, 420. 10.3390/s1802042029389856PMC5855078
13
Gavilán, M., Sánchez, F., Ramos, J.A., Marcos, O. (2013), "Mobile inspection system for high-resolution assessment of tunnels", Proceedings of the 6th International Conference on Structural Health Monitoring of Intelligent Infrastructure, Hong Kong, China.
14
Han, S.H., Cho, H.S., Kim, S.M., Jung, J.H., Heo, J. (2013), "Automated and efficient method for extraction of tunnel cross sections using terrestrial laser scanned data", Journal of Computing in Civil Engineering, Vol. 27, No. 3, pp. 274-281. 10.1061/(ASCE)CP.1943-5487.0000211
15
Han, S.H., Cho, S.H., Kim, S.M., Heo, J., Sohn, H.G., You, K.H. (2010), "Developing a method of processing terrestrial laser scan data for efficient extraction of tunnel cross sections", Journal of Korean Tunnelling and Underground Space Association, Vol. 12, No. 3, pp. 239-245.
16
Hi-Rail (2023), Track Moving 3D Laser Measurement System (rMMS), http://www.hirail.cn/product_detail/id/7.html (February 7, 2023).
17
Huang, Z., Zhang, C.L., Fu, H.L., Ma, S.K., Fan, X.D. (2021), "Machine inspection equipment for tunnels: a review", Journal of Highway and Transportation Research and Development, Vol. 15, No. 2, pp. 40-53. 10.1061/JHTRCQ.0000774
18
Ji, C., Sun, H., Zhong, R., Sun, M., Li, J., Lu, Y. (2023), "Deformation detection of mining tunnel based on automatic target recognition", Remote Sensing, Vol. 15, No. 2, 307. 10.3390/rs15020307
19
Jiang, Y., Zhang, X., Taniguchi, T. (2019), "Quantitative condition inspection and assessment of tunnel lining", Automation in Construction, Vol. 102, pp. 258-269. 10.1016/j.autcon.2019.03.001
20
Kang, Z., Tuo, L., Zlatanovab, S. (2012), "Continuously deformation monitoring of subway tunnel based on terrestrial point clouds", Proceedings of the XXII ISPRS Congress, Melbourne, Australia, Vol. XXXIX, pp. 199-203. 10.5194/isprsarchives-XXXIX-B5-199-2012
21
Kawahara, S., Doi, H., Shirato, M., Kajifusa, N., Kutsukake, T. (2014), Investigation of the tunnel ceiling collapse in the central expressway in Japan, Proceedings of the TRB 93rd Annual Meeting, Washington D.C., TRB Paper Manuscript #14-2559.
22
Kim, I.S., Lee, C.H. (2018), "Development of video shooting system and technique enabling detection of micro cracks in the tunnel lining while driving", Journal of the Korean Society of Hazard Mitigation, Vol. 18, No. 5, pp. 217-229. 10.9798/KOSHAM.2018.18.5.217
23
Kim, I.S., Lim, S.B. (2007), "A study on 3D section profiling surveying in tunnel excavation using a laser scanner", KSCE Journal of Civil and Environmental Engineering Research, Vol. 27, No. 4D, pp. 541-546.
24
Ko, B.S., Son, Y.K., Shin, D.I., Kim, B.H., Han, C.S. (2004), "Development of inspection system for crack on the lining of concrete tunnel", Journal of Institute of Control, Robotics and Systems, Vol. 10, No. 1, pp. 66-72. 10.5302/J.ICROS.2004.10.1.066
25
Lee, K.H., Heo, I.W., Kim, D.H., Lee, I.M. (2011), "The construction management of tunnel using 3D laser scanner", Journal of Korean Tunnelling and Underground Space Association, Vol. 13, No. 3, pp. 159-176.
26
Lee, G.P., Lim, H.J., Kim, J.H. (2020), "Availability evaluation of automatic inspection equipment using line scan camera for concrete lining", Journal of Korean Tunnelling and Underground Space Association, Vol. 22, No. 6, pp. 643-653. 10.9711/KTAJ.2020.22.6.643
27
Lee, J.O., Yun, B.Y. (2007), "Tunnel convergence and crown settlement using 3D laser scanning", Journal of Korean Society for Geospatial Information Science, Vol. 15, No. 2, pp. 67-75. 10.7319/kogsis.2017.25.2.067
28
Lee, T.H., Park, J.T., Lee, S.H., Park, S.Z. (2022), "Performance of feature-based stitching algorithms for multiple images captured by tunnel scanning system", Journal of The Korea Institute for Structural Maintenance and Inspection, Vol. 26, No. 5, pp. 30-42. 10.11112/jksmi.2015.19.5.030
29
Leica Geosystem (2023), SiTrack One Mobile Track Scanning System, https://www.ltrade.com.ua/product/leica-sitrackone/ (February 7, 2023).
30
Li, J., Wan, Y., Gao, X. (2012), "A new approach for subway tunnel deformation monitoring: high-resolution terrestrial laser scanning", Proceedings of the XXII ISPRS Congress, Melbourne, Australia, Vol. XXXIX-B5, pp. 223-228. 10.5194/isprsarchives-XXXIX-B5-223-2012
31
Martínez-Carricondo, P., Agüera-Vega, F., Carvajal-Ramírez, F., Mesas-Carrascosa, F.J., García-Ferrer, A., Pérez-Porras, F.J. (2018), "Assessment of UAV-photogrammetric mapping accuracy based on variation of ground control points", International Journal of Applied Earth Observation and Geoinformation, Vol. 72, pp. 1-10. 10.1016/j.jag.2018.05.015
32
Montero, R., Victores, J.G., Martínez, S., Jardón, A., Balaguer, C. (2015), "Past, present and future of robotic tunnel inspection", Automation in Construction, Vol. 59, pp. 99-112. 10.1016/j.autcon.2015.02.003
33
NETIS (2023), New Technology Information System, https://www.netis.mlit.go.jp/netis/ (February 7, 2023).
34
NTSB (2006), Ceiling collapse in the interstate 90 connector tunnel, National Transportation Safety Board, Boston, Massachusetts, USA.
35
O'Neill, B. (2020), Terrestrial Laser Scanners (TLS): Guide and Product Selection, https://www.aniwaa.com/buyers-guide/3d-scanners/terrestrial-laser-scanners-long-range/ (February 7, 2023).
36
Panella, F., Roecklinger, N., Vojnovic, L., Loo, Y., Boehm, J., (2020), "Cost-benefit analysis of rail tunnel inspection for photogrammetry and laser scanning", Proceedings of the International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives, pp. 1137-1144. 10.5194/isprs-archives-XLIII-B2-2020-1137-2020
37
Park, H.S. (2013), "Performance analysis of the tunnel inspection system using high speed camera", Journal of Korean Institute of Information Technology, Vol. 11, No. 4, pp. 1-6. 10.14801/kiitr.2013.11.4.1
38
RICON (2021), Framework and implication of NETIS (New Technology Information System) in Japan, Korea Research Institute for Construction Policy, Korea.
39
Roh, T.H., Kim, J.S., Lee, Y.D. (2008), "Development of cross section management system in tunnel using terrestrial laser scanning data", Journal of the Korean Association of Geographic Information Studies, Vol. 11, No. 1, pp. 90-104.
40
Sagong, M., Moon, C.Y., Lee, J.S., Hwang, S.K., Kim, B.H. (2006), "Development of a 3D laser scanner based tunnel scanner", Journal of Korean Tunnelling and Underground Space Association, Vol. 8, No. 4, pp. 377-388.
41
Sagong, M., Koh, T.H., Chun, B., Lee, B., Byun, Y. (2012), "Application of the image and laser sensors based tunnel scanning system", Viggiani et al. (ed.) Geotechnical Aspects of Underground Construction in Soft Ground, Taylor & Francis Group, pp. 105-109.
42
Seo, D.J., Lee, J.C., Lee, Y.D., Lee, Y.H., Mun, D.Y. (2008), "Development of cross section management system in tunnel using terrestrial laser scanning technique", International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Vol. 37, No. B5, pp. 573-582.
43
Spacetec (2023), TS-3 Three Channels Scanner, https://www.spacetec.de/en/products/ts3/ (February 7, 2023).
44
Stałowska, P., Suchocki, C., Rutkowska, M. (2022), "Crack detection in building walls based on geometric and radiometric point cloud information", Automation in Construction, Vol. 134, 104065. 10.1016/j.autcon.2021.104065
45
Sun, H., Xu, Z., Yao, L., Zhong, R., Du, L., Wu, H. (2020), "Tunnel monitoring and measuring system using mobile laser scanning: design and deployment", Remote Sensing, Vol. 12, No. 4, 730. 10.3390/rs12040730
46
Tabrizi, K., Celaya, M., Miller, B.S., Wittwer, A., Ruzzi, L. (2017), "Damage assessment of tunnel lining by mobile laser scanning: Pittsburgh, Pennsylvania, Implementation Phase of FHWA SHRP 2 R06G Project", Transportation Research Record, Vol. 2642, No. 1, pp. 166-179. 10.3141/2642-18
47
Ukai, M. (2007), "Advanced inspection system of tunnel wall deformation using image processing", Quarterly Report of RTRI, Vol. 48, No. 2, pp. 94-98. 10.2219/rtriqr.48.94
48
Van Gosliga, R., Lindenbergh, R., Pfeifer, N. (2006), "Deformation analysis of a bored tunnel by means of terrestrial laser scanning", Proceedings of the International Archives of Photogrammetry, Remote Sensing and Spatial Information Systems, Dresden, Germany, Vol. XXXVI, pp. 25-27.
49
Wang, H., Wang, Q., Zhai, J., Yuan, D., Zhang, W., Xie, X., Zhou, B., Cai, J., Lei, Y. (2022), "Design of fast acquisition system and analysis of geometric feature for highway tunnel lining cracks based on machine vision", Applied Sciences, Vol. 12, No. 5, 2516. 10.3390/app12052516
50
Wang, W., Zhao, W., Huang, L., Vimarlund, V., Wang, Z. (2014), "Applications of terrestrial laser scanning for tunnels: a review", Journal of Traffic and Transportation Engineering, Vol. 1, No. 5, pp. 325-337. 10.1016/S2095-7564(15)30279-8
51
Xu, L., Gong, J., Na, J., Yang, Y., Tan, Z., Pfeifer, N., Zheng, S. (2022), "Shield tunnel convergence diameter detection based on self-driven mobile laser scanning", Remote Sensing, Vol. 14, No. 3, 767. 10.3390/rs14030767
52
Yasuda, T., Yamamoto, H., Enomoto, M., Nitta, Y. (2020), "Smart tunnel inspection and assessment using mobile inspection vehicle, non-contact radar and AI", Proceedings of the 37th International Symposium on Automation and Robotics in Construction: From Demonstration to Practical Use To New Stage of Construction Robot, ISARC 2020, Kitakyushu, Japan, pp. 1373-1379. 10.22260/ISARC2020/0190
53
Yasuda, T., Yamamoto, H., Shigeta, Y. (2016), "Tunnel inspection system by using high-speed mobile 3D survey vehicle: MIMM-R", Journal of Robotics Society of Japan, Vol. 34, No. 9, pp. 589-590. 10.7210/jrsj.34.589
54
Yoon, J.S., Sagong, M., Lee, J.S., Lee, K.S. (2007), "A detection algorithm for the installations and damages on a tunnel liner using the laser scanning data", Journal of Korean Tunnelling and Underground Space Association, Vol. 9, No. 1, pp. 19-28.
55
Yoon, J.S., Sagong, M., Lee, J.S., Lee, K.S. (2009), "Feature extraction of a concrete tunnel liner from 3D laser scanning data", NDT & E International, Vol. 42, No. 2, pp. 97-105. 10.1016/j.ndteint.2008.10.001
56
Yoon, T.G., Lee, S. (2008), "A study for tunnel management system development using a tunnel scanner", Journal of the Korea Institute for Structural Maintenance and Inspection, Vol. 12, No. 3, pp. 183-190.
57
Yu, S.N., Jang, J.H., Han, C.S. (2007), "Auto inspection system using a mobile robot for detecting concrete cracks in a tunnel", Automation in Construction, Vol. 16, No. 3, pp. 255-261. 10.1016/j.autcon.2006.05.003
58
Zhan, D., Yu, L., Xiao, J., Chen, T. (2015), "Multi camera and structured light vision system (MSVS) for dynamic high accuracy 3D measurements of railway tunnels", Sensors, Vol. 15, No. 4, pp. 8664-8684. 10.3390/s15040866425875190PMC4431261
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 25
  • No :3
  • Pages :245-259
  • Received Date : 2023-05-02
  • Revised Date : 2023-05-17
  • Accepted Date : 2023-05-18