All Issue

2006 Vol.8, Issue 3
30 September 2006. pp. 197-204
Abstract
References
1
1.電力工事技術委員會(2001), “TBM工法による施工事例調査”, 社團法人日本電力建設業協會
2
2.要原和未(1996),“泥水加壓シールド工法”, わかりやすい 土木技術, p. 9-14.
3
3.Anagnostou, G. and Kovari, K.(1996), “Face stabi-lity conditions with earth-pressure-balan-ced shields”, Tunnelling and Underground Spa-ce Te-chno-logy, Vol. 11, No. 2, pp. 165-173.
4
4.Anagnostou, G. and Kovari, K.(1994), “The face stability of slurry-shield-driven tunnels”, Tun-nelling and Underground Space Te-chno-logy, Vol. 9, No. 2, pp. 165-174.
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 8
  • No :3
  • Pages :197-204