Abstract
References
1.김범주, 황영철 (2008), “NATM 터널굴착시 초기 내공변위와 최종 내공변위의 상관관계 연구”, 터널기술 한국터널공학회 논문집, 제9권, 제10-3호, pp. 233-243. 10.鈴木健之, 土門 剛 , 西村 和夫, 徐景源 (2003), “地山特性曲線および応力解放曲線を用いたトソネル掘削時の地山擧動予測”, トンネル工学研究會論文報告集, 第 13券, pp. 129-134. 16.Hoek, E. and Marinos, P. (2000), “Predicting tunnel squeezing problems in weak heterogeneous rock masses”, Tunnels and Tunnelling. 17.ISRM. (1981), Basic geotechical description of rock masses, int J. Rock Mech Min. & Geomech Abstr. 18, pp. 85-110. 19.Sakurai, S. (1997), “Lessons Learned from Field Measurements in Tunnelling”, Tunnelling and Underground Space Technology, Vol. 12, No. 4, pp. 453-460.
Information
- Publisher :Korean Tunneling and Underground Space Association
- Publisher(Ko) :한국터널지하공간학회
- Journal Title :Journal of Korean Tunnelling and Underground Space Association
- Journal Title(Ko) :한국터널지하공간학회 논문집
- Volume : 11
- No :4
- Pages :403-410
- Received Date : 2009-10-09
- Revised Date : 2009-11-04
- Accepted Date : 2009-11-13


Journal of Korean Tunnelling and Underground Space Association







