Abstract
References
1. Ausstellung Congress Centrum Hamburg (1997): Die Inkunft liegh unter nus. Hamburg Messe und Congress Gmbh, 1-62. 2. Barla G. (1998): “Tunnelling in difficult conditions”. Int. Conf. on Hydro Power Development in Himalayas, Shimla (India), 20-22 April. 3. Barla G. and Pelizza S. (2000): “TBM tunneling in difficult ground conditions”, Proc. GeoEng 2000, Melbourne. 4. Barton N. (1999): “TBM performance in rock using QTBM”, Tunnels and Tunnelling International, 30- 35. 5. Bellini A., De Domenico R. and Da Forno G. (1991): “Gli infilaggi metallici a contatto per il superamento con fresa scudata a piena sezione di una frana al fronte in graniti completamente degradati, con forti venute d’acqua”, Proc. Congr. on “Soil and Rock Improvement in Underground Works”, SIG, Milano, 65-72. 6. Bruland A. (1998): “Future Demands and De- velopment Trends”. Norvegian TBM Tunnelling, Publication No. 11, NFF, Oslo, 99-103. 7. Chapperon D. and Antonini F. (1996): “12,2km of tunnel to supply Cadiz with water with a 4,88m double shielded TBM”. AFTES-Jour. d’Et. Int. de Chambery, 21-24 October, 313-319. 8. DAUB (1997): “Recommendations for selecting and evaluating tunnel boring machines”. Tunnel, August, No.5/97, 20-35. 9. Einstein H.H. (1996): “Risk and Risk Analysis in Rock Engineering”. Tunneling and Underground Space Technology, Vol.11, N.2, 141-155. 10. Foster J.R. (1997): “Gibraltar Strait Crossing. Characterization of TBM”. UN/ITA Workshop on Characterization for tunneling flysches, Tarifa, 20-22 February, 16 pages. 11. Gehring K. and Kogler P. (1997): “Mechanized tunneling: where it stands and where it has to proceed from a manufacturers view point”. World Tunnel Congress, Wien 97, ITA, 12-17 April, 651-664. 12. Grandori R. (1996a):“Avanzamento meccanico in condizioni estreme. Scelta del tipo di TBM e sue caratteristiche”, Proc. III Symp. Europeen de la construction de tunnels, Berne, pp. 50-58. 13. Grandori R. (1996b): “The universal TBM in the year 2000. Technical aspects and contractor consideration”. Gallerie e grandi opere sotterranee, SIG, No.50, November, 38-48. 14. Hanamura T. (1995): “State of the Art of the Japanese TBM Technology. New Developments”. TBM Tunnelling Trends, International Lecture Series, Central Austria Training in Technologies, Relay Center Austria of the EU Regional Office Linz, Dec. 1995, 13 pages. 15. Hartley P. (1996): “Tunnelling through the present to the future”. Tunnel and Tunnelling, December, 30-35. 16. Innaurato N. and Pelizza S. (1968): “Scavo di gallerie con tunneler”. Boll. Associazione Mineraria Subalpina, Torino, V, No 3, 345-398. 17. Innaurato N. and Peila D. (1996): “Statistical analysis of TBM performances” - AFTES - Int. Conf. Underground Works: of Techniques and Men, Chambery, pp.131-134 18. Iwasaki T., Miura K., Kawakita M., Yamada T., Sano N. (1999): “Along tunnel project by TBM method”. ITA World Tunnel Congress in Oslo “Challenges for the 21st Century”, Balkema, 857-863. 19. Kawatani T., Tezuka H., Morita R. and Shimaya S., (1999): “Tunnel construction with large-scale TBM in a collapse prone-poor rock conditions”. ITA World Tunnel Congress in Oslo “Challenges for the 21st Century”, Balkema, 895-901. 20. Kovari K. Fechtig R. and Amstad Ch. (1993): “Experience with large diameter Tunnel Boring Machines in Switzerland”. Int. Congr. Option for tunnelling, ITA, Amsterdam, 14 pages. 21. Lombardi G. (1996): “Aspects de la mecanique de la roche lors d'un avancement a l’explosif et par tunnelier”. 3e Symp. Europeen de la construction de tunnels, Berne, 21-22 Mars, 24-28. 22. Lombardi G. and Panciera A. (1997): “Problems with TBM and linings in squeezing ground”. Tunnel and Tunneling Internationl, June 97, 54-57. 23. Parker H.W. (1999): “Development of Hard and Soft Underground Construction”. X Australian Tunnelling Conference, Melbourne, 21-24 March, 25-31. 25. Pelizza S. and Peila D. (1993): “Soil and rock reinforcements in tunnelling”, Tunnelling and Underground Space Technology, 8, n.3, Pergamon Press, Oxford , 357-372. 26. Pelizza S. (1998): “Selection of TBMs”. Work- shop on Selection of Tunnelling Methods, ITA World Tunnel Congress ’98, Sao Paulo (Brazil). 27. Pelizza S. (1999a): “TBM bored long rock tunnels”. Proceedings ITA Open Session, ITA World Tunnel Congress '99, Oslo, June 2, 39-43. 28. Pelizza S. (1999b): “Engineering Risks in Tunnelling”, Underground Construction in Germany 2000, STUVA, 103-106. 29. Pelizza S. (2000) “Long TBM Drives in Rock formation”, Seminar on “Design, construction, operation and other aspects of tunnels”, Petaling Java, Malaysia. 30. Robbins R.J. (1987): “Machine Tunnelling in the Twenty-First Century”. Tunnelling and Underground Space Technology, Vol. 2, No. 2, 147-154. 31. Salvi Penati (1991): “Grazie all’Enel la prima fresa in Italia”, Gallerie e Grandi Opere Sotterranee, SIG, 33 32. Stack B. (1982): Handbook of Mining and Tunnelling Machinery. Wiley Interscience Publication (UK), I-XXIX, 1-742. 33. Tarkoy P.J. (1995): “Comparing TBMs with drill+ blast excavation”. Tunnels and Tunneling, October ’95, 41-44. 34. Tseng Y.Y., Wong S.L., Chu B. and Wong C.H. (1998): “The Pinglin Mechanized Tunneling in difficult Ground”. St8th Congr. of IAEG, Vancouver (Canada), 21-25 September.
Information
- Publisher :Korean Tunneling and Underground Space Association
- Publisher(Ko) :한국터널지하공간학회
- Journal Title :Journal of Korean Tunnelling and Underground Space Association
- Journal Title(Ko) :한국터널지하공간학회 논문집
- Volume : 6
- No :2
- Pages :85-100


Journal of Korean Tunnelling and Underground Space Association







