Abstract
References
1.김영근, 문준식, 심재법, 이승복, 최창림, 천윤철 (2011), “도심지 대단면 복합지반 NATM과 TBM 터널공법의 비교위험도 분석”, 한국터널지하공간학회논문집, 제13권 제1호, pp. 19-32. 4.장수호, 최순욱, 이규필, 배규진 (2011a), “TBM 굴진자료의 다변량 회귀분석에 의한 암반대응형 TBM의 설계모델 도출”, 한국터널지하공간학회논문집, 제13권 제6호, pp. 531-555. 8.Broissia, M., Aristaghes, P., Bäppler, K., Gal, G., Del Corso, C. Bruland, A., Armada, M., Duchateau, D. (2001), “Global optimisation of disc cutter tool life for tunnel boring machine”, Proceedings of the 4th EUROTHEN workshop, Stockholm, Sweden, July 2001, pp. 1-16. 9.Bruland, A. (1998), “Hard rock tunnel boring - Drillability test methods”, Vol. 8, Doctoral Theses at NTNU 1998:81, pp. 13-15. 10.Cho, J.W, Jeon, S.W., Yu, S.H., Chang, S.H. (2010), “Optimum spacing of TBM disc cutters: A numerical simulation using the three-dimensional dynamic fracturing method”, Tunnelling and Underground Space Technology, Vol. 25, Issue 3, pp. 230-244. 13.Käsling, H., Thuro, K. (2010), “Determining rock abrasivity in the laboratory”, Proceedings of the European Rock Mechanics Symposium EUROCK 2010, Lausanne, Switzerland, 15-18 June 2010, pp. 4-7.
Information
- Publisher :Korean Tunneling and Underground Space Association
- Publisher(Ko) :한국터널지하공간학회
- Journal Title :Journal of Korean Tunnelling and Underground Space Association
- Journal Title(Ko) :한국터널지하공간학회 논문집
- Volume : 14
- No :3
- Pages :197-213
- Received Date : 2012-04-21
- Revised Date : 2012-05-09
- Accepted Date : 2012-05-16


Journal of Korean Tunnelling and Underground Space Association







