All Issue

2011 Vol.13, Issue 1 Preview Page
31 January 2011. pp. 19-32
Abstract
References
1
1.Barla, G., Pelizza, S. (2000), TBM Tunnelling in Difficult Ground Conditions.
2
2.Barton, N. (2000), TBM Tunneling in Jointed and Faulted Rock, Taylor & Francis, p. 184.
3
3.Holen, H., Anlegg, S. (1998), TBM vs drill & blast tunnelling, Norwegian TBM Society, pp. 95~98.
4
4.Huang, R. (2008), The Shanghai Yangtse River Tunnel: Theory, Design, and Construction, p. 360.
5
5.Parsons Brinckerhoff, Inc. (2010), Tunnel Options Risk Assessment for OOO Road Expansion Project.
6
6.Samsung C&T (2010a), OOO Road Expansion Project – Geotechnical Investigation Report.
7
7.Samsung C&T (2010b), OOO Road Expansion Project – Tunnel Design Report.
8
8.Tarkoy, P.J. (1996), “Comparing TBMs with drill and blast excavation”, Int’l J. of Rock Mech. and Mining Sci. and Geomech. Abst., Vol. 33, No. 4, pp. 186A~186A(1).
9
9.URS Corporation (2005), OOO Tunnel Project – Qualitative Risk Assessment Report.
10
10.Kim, Y., Hencher, S.R., Yoon, Y., Cho, S. (2002), “Determination of the construction method for Young Dong Tunnel by risk assessment”, Tunneling Technology, Vol. 4, No. 1, pp. 13~25.
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 13
  • No :1
  • Pages :19-32
  • Received Date : 2010-08-31
  • Revised Date : 2010-09-23
  • Accepted Date : 2011-01-10