All Issue

2024 Vol.26, Issue 4

Research Paper

31 July 2024. pp. 303-314
Abstract
References
1

Al-Zuheri, A., Amer, Y., Vlachos, I. (2019), "Risk assessment and analysis of healthcare system using probability-impact matrix", Nursing & Primary Care, Vol. 3, No. 4, pp. 1-4.

10.33425/2639-9474.1121
2

Broere, W. (2016), "Urban underground space: solving the problems of today's cities", Tunnelling and Underground Space Technology, Vol. 55, pp. 245-248.

10.1016/j.tust.2015.11.012
3

Chen, C.N., Huang, W.Y., Tseng, C.T. (2011), "Stress redistribution and ground arch development during tunneling", Tunnelling and Underground Space Technology, Vol. 26, No. 1, pp. 228-235.

10.1016/j.tust.2010.06.012
4

Cho, J.W., Kim, M.G., Park, H.J., Oh, J.Y., Song, C.H. (2024), "Optimization of thrust forces for consecutive advance of shield TBM and validation test by scaled TBM model", International Journal of the JSRM, Vol. 20, No. 2, pp. 1-4.

10.11187/ijjsrm.240205
5

Choi, Y.T., Lee, D.G., Kim, M.G., Oh, J.Y., Cho, J.W. (2022), "Continuous excavation type TBM parts modification and control technology for improving TBM performance", Tunnel and Underground Space, Vol. 32, No. 6, pp. 345-352.

10.7474/TUS.2022.32.6.345
6

Chung, H., Park, J., Kim, B.K., Kwon, K., Lee, I.M., Choi, H. (2021), "A causal network-based risk matrix model applicable to shield TBM tunneling projects", Sustainability, Vol. 13, No. 9, 4846.

10.3390/su13094846
7

Hillson, D. (2002), "Extending the risk process to manage opportunities", International Journal of Project Management, Vol. 20, No. 3, pp. 235-240.

10.1016/S0263-7863(01)00074-6
8

Hyun, K.C., Min, S., Choi, H., Park, J., Lee, I.M. (2015), "Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels", Tunnelling and Underground Space Technology, Vol. 49, pp. 121-129.

10.1016/j.tust.2015.04.007
9

Ikwan, F., Sanders, D., Hassan, M. (2021), "Safety evaluation of leak in a storage tank using fault tree analysis and risk matrix analysis", Journal of Loss Prevention in the Process Industries, Vol. 73, 104597.

10.1016/j.jlp.2021.104597
10

Jing, L.J., Li, J.B., Zhang, N., Chen, S., Yang, C., Cao, H.B. (2021), "A TBM advance rate prediction method considering the effects of operating factors", Tunnelling and Underground Space Technology, Vol. 107, 103620.

10.1016/j.tust.2020.103620
11

Jung, M. (2013), The comparative study of shield-TBM cycle time through design and construction, Master Thesis, Seoul National University of Science and Technology, pp. 1-62.

12

Kim, M.G., Cho, J.W., Cha, H.S. (2023), "Investigation of prior technology and development case for consecutive excavation technique of shield TBM", Tunnel and Underground Space, Vol. 33, No. 5, pp. 299-311.

10.7474/TUS.2023.33.5.299
13

Kwon, K., Kang, M., Hwang, B., Choi, H. (2023a), "Study on risk priority for TBM tunnel collapse based on Bayes theorem through case study", KSCE Journal of Civil and Environmental Engineering Research, Vol. 43, No. 6, pp. 785-791.

10.12652/Ksce.2023.43.6.0785
14

Kwon, K., Kang, M., Kim, D., Choi, H. (2023b), "Prioritization of hazardous zones using an advanced risk management model combining the analytic hierarchy process and fuzzy set theory", Sustainability, Vol. 15, No. 15, 12018.

10.3390/su151512018
15

Min, S.Y., Einstein, H.H., Lee, J.S., Kim, T.K. (2003), "Application of decision aids for tunneling (DAT) to a drill & blast tunnel", KSCE Journal of Civil Engineering, Vol. 7, pp. 619-628.

10.1007/BF02838325
16

Moradi, M.R., Farsangi, M.A.E. (2014), "Application of the risk matrix method for geotechnical risk analysis and prediction of the advance rate in rock TBM tunneling", Rock Mechanics and Rock Engineering, Vol. 47, pp. 1951-1960.

10.1007/s00603-013-0464-x
17

Park, J., Chung, H., Moon, J.B., Choi, H., Lee, I.M. (2016), "Overall risk analysis of shield TBM tunnelling using Bayesian networks (BN) and analytic hierarchy process (AHP)", Journal of Korean Tunnelling and Underground Space Association, Vol. 18, No. 5, pp. 453-467.

10.9711/KTAJ.2016.18.5.453
18

Shang, W.J., Jing, W.Z., Liu, J., Liu, M. (2023), "Global epidemic of Ebola virus disease and the importation risk into China: an assessment based on the risk matrix method", Biomedical and Environmental Sciences, Vol. 36, No. 1, pp. 86-93.

10.3967/bes2023.008
19

Siraj, N.B., Fayek, A.R. (2019), "Risk identification and common risks in construction: Literature review and content analysis", Journal of Construction Engineering and Management, Vol. 145, No. 9, 03119004.

10.1061/(ASCE)CO.1943-7862.0001685
20

Sousa, R.L., Einstein, H.H. (2021), "Lessons from accidents during tunnel construction", Tunnelling and Underground Space Technology, Vol. 113, 103916.

10.1016/j.tust.2021.103916
21

You, K.H., Park, C.M. (2016), "A study on the risk and settlement evaluation of a shield TBM excavated in soft marine sedimentary soils", Journal of Korean Tunnelling and Underground Space Association, Vol. 18, No. 4, pp. 355-364.

10.9711/KTAJ.2016.18.4.355
22

Zhang, S., Du, C., Sa, W., Wang, C., Wang, G. (2014), "Bayesian-based hybrid simulation approach to project completion forecasting for underground construction", Journal of Construction Engineering and Management, Vol. 140, No. 1, 04013031.

10.1061/(ASCE)CO.1943-7862.0000764
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 26
  • No :4
  • Pages :303-314
  • Received Date : 2024-05-17
  • Revised Date : 2024-06-14
  • Accepted Date : 2024-06-26