All Issue

2025 Vol.27, Issue 6 Preview Page

Technical Paper

30 November 2025. pp. 663-672
Abstract
References
1

Jun, G.C., Kim, D.H. (2016), “A intercomparison on the estimating shield TBM tunnel face pressure through analytical and numerical analysis”, Journal of Korean Tunnelling and Underground Space Association, Vol. 18, No. 3, pp. 273-282.

10.9711/KTAJ.2016.18.3.273
2

Kim, H.M., Kim, H.S., Shim, K.M., Ahn, S.Y. (2017), “A study on the factors influencing the segment lining design solved by beam-spring model in the shield tunnel”, Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 2, pp. 179-194.

10.9711/KTAJ.2017.19.2.179
3

Kim, J.Y., Jung, J.H., Lee, J.W., Yim, J.H., Shin, Y.J. (2024), “Case study of data-based TBM planning and construction management system application”, Journal of Korean Tunnelling and Underground Space Association, Vol. 26, No. 6, pp. 695-711.

10.9711/KTAJ.2024.26.6.695
4

Kim, S., Kim, D. (2024), “Evaluation of excavation damage zone during TBM excavation - A large deformation FE analysis study”, Journal of Korean Tunnelling and Underground Space Association, Vol. 26, No. 1, pp. 1-17.

10.9711/KTAJ.2024.26.1.001
5

Lee, G.P., Bae, G.J., Moon, D.Y., Kang, T.S., Chang, S.H. (2013), “Evaluation of steel fiber reinforcement effect in segment lining by full scale bending test”, Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 3, pp. 215-223.

10.9711/KTAJ.2012.14.3.215
6

Lee, G.P., Chang, S.H. (2019), “Stability analysis of shield tunnel segment lining by field measurement and full scale bending test”, Journal of Korean Tunnelling and Underground Space Association, Vol. 21, No. 5, pp. 611-620.

10.9711/KTAJ.2019.21.5.611
7

Lee, Y.J., Kim, K.L., Jeong, K.W., Hong, E.J., Kim, S.H., Jun, D.C. (2015), “A study on the design of shield tunnel lining in high water pressure condition”, Journal of Korean Tunnelling and Underground Space Association, Vol. 17, No. 3, pp. 227-236.

10.9711/KTAJ.2015.17.3.227
8

Woo, S., Chung, E., Yoo, C. (2016), “Development of optimized TBM segmental lining design system”, Journal of Korean Tunnelling and Underground Space Association, Vol. 18, No. 1, pp. 13-30.

10.9711/KTAJ.2016.18.1.013
9

Yang, S., Choi, H., Kwon, K., Hwang, C., Kang, M. (2023), “Numerical simulations on electrical resistivity survey to predict mixed ground ahead of a TBM tunnel”, Journal of Korean Tunnelling and Underground Space Association, Vol. 25, No. 6, pp. 403-421.

10.9711/KTAJ.2023.25.6.403
10

Yeom, Y., Choi, H., Yang, Y., Kwon, K. (2025), “Application of data augmentation for enhancing machine learning-based TBM disc cutter wear prediction”, Journal of Korean Tunnelling and Underground Space Association, Vol. 27, No. 3, pp. 217-232.

10.9711/KTAJ.2025.27.3.217
11

Yoo, C.S., Jeon, H.M. (2012), “A comparative study on methods for shield tunnel segment lining sectional forces”, Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 3, pp. 159-181.

10.9711/KTAJ.2012.14.3.159
Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 27
  • No :6
  • Pages :663-672
  • Received Date : 2025-11-07
  • Revised Date : 2025-11-24
  • Accepted Date : 2025-11-24