All Issue

2013 Vol.15, Issue 1 Preview Page
31 January 2013. pp. 33-47
Abstract
References
1

1.ANSYS, Inc. (2010), ANSYS AUTODYN, Ver. 13, ANSYS Inc., USA.

2

2.Cho, J.W., Yu, S.H., Jeon, S.W., Chang, S.H. (2008), “Numerical study on rock fragmentation by TBM disc cutter”, Journal of Korea Tunnelling Association, Vol. 10, No. 2, pp. 139-152.

3

3.Gerber, E., Scheidegger, A.E. (1974), “On the dynamics of scree slopes”, Rock Mechanics, Vol. 6, No. 1, pp. 25-38.

http://dx.doi.org/10.1007/BF01238051
4

4.Go, D.C., Jung, B.R., Kim, J.M., Jung, W.G., Ryu, D.H., Song, C.R. (2010), “The study of advanced mucking method for tunnelling”, The 2010 Annual Conference of Korea Tunnelling Association, pp. 212-231.

5

5.Kim, J.Y., Jeong, K.H., Song, C.H., Yoo, C.S. (2008), “A study on the influence of blasting-induced vibration in both adjacent rock and the concrete center wall in a 2-Arch tunnel”, The 2008 Annual Conference of Korea Tunnelling Association, pp. 261-274.

6

6.Kim, S.R. (2003), Understanding of the classes for the mensuration by parts with using Mathematica, Pusan University of Foreign Studies, Graduate School, Master's Degree Thesis, p. 25.

7

7.Konya, C.J., Walter, E.J. (1991), Rock blasting and overbreak control, National highway institute, p. 430.

8

8.Korea Institute of Construction Technology (2011), 2011 Standard of construction estimate, Korea Institute of Construction Technology, p. 1361.

9

9.Korean Society for Rock Mechanics (2007), Slope engineering, Gunsul-jungbo Co., p. 525.

10

10.Nam, K.C., Kim, Y.S., Kim, C.H., You, K.H., Kim, S.H., Kang, B.S., Kim, J.M., Choi, J.S. (2010), Civil construction management for actual work (6 edition), Hansol Academy Publishing Co., p. 880.

11

11.Park, J.W. (2012), Analysis of structure subjected to blast load using parallel and domain, Hanyang University, Graduate School, Master’s Degree Thesis, p. 50.

12

12.Riedel, W., Thoma, K., Hiermaier, S., Schmolinske, E. (1999), “Penetration of reinforced concrete by BETAB-500 numerical analysis using a new mac-roscopic concrete model for hydrocodes” The 9th Int. Sym. on Interaction of the Effects of Munitions with Structures, Berlin, Germany, pp. 315-322.

13

13.Seol, J.S., Kim, H.C., Kim, S.S., Lim, K.W., Kim, H.C., Kim, D.S., Kim, J.S., Lee, M.J., Chun, B.S., Lee, K.I., Yoon, I.S., Choi, H.S., Bae, E.H., Park, J.H., Kim, H.M., Kim, Y.N., Jeon, M.I., Cho, Y.H., Lee, K.H., Lee, S.H., Ma, S.J., Jeon, S.W., Kim, S.R., Lee, E.T., Park, Y.S., Park, G.Y., Han, M.Y., Cho, Y.W., Roh, B.G., Jung, B.R., Kang, L.S. (2009), Construction management for actual work (2 edition), Goomibook Inc., p. 1112.

14

14.SolidWorks Co. (2011), SolidWorks 3D, Ver. 2011, SolidWorks Co, Massachusetts, USA.

15

15.Yoon, H.K. (2009), Analytic study on controlled blasting by pre-cracked notch, Inha University, Graduate School, Master’s Degree Thesis, p. 116.

16

16.You, K.H., Kim, D.H. (2012), “A study on the influence of blasting location on tunnel fragmentation zone”, 2012 Korean Geotechnical Society, Geo Expo, pp. 1611-1615.

17

17.You, K.H., Jeon, S.W. (2012), “Prediction of rehabilitation time for a tunnel damaged by blasting”, DAPS2012, The 4th International Conference on Design and Analysis of Protective Structures, Hyatt Regency, Jeju, Korea, P-T3-1.

Information
  • Publisher :Korean Tunneling and Underground Space Association
  • Publisher(Ko) :한국터널지하공간학회
  • Journal Title :Journal of Korean Tunnelling and Underground Space Association
  • Journal Title(Ko) :한국터널지하공간학회 논문집
  • Volume : 15
  • No :1
  • Pages :33-47